Here is a gallery of photos displaying past work
12x16 Office, windows set, ready for siding.
12x16 Office complete, ready for use.
12x16 Office framing, two door openings.
12x16 Office framing, concrete slab foundation.
12x16 addition to an existing accessory building.
10x14 storage shed on concrete slab foundation.
Tongue and Groove soffit with custom cut slotted vents.
12x16 Office asphalt shingle roofing. The roof ended up being ~16'x20' after added overhangs.
Some interesting looking framing to tie in a gable roof to a 5-pitch field on an addition.
A blue 8x12 shed on concrete pier blocks and pressure treated skids.
Framing of a 12x16 addition to an existing structure.
Framing of a nearly 20' wide staircase.
Framing and risers for a roughly 20' wide stair set.
Completed stair set with railing replaced. The painted risers are to keep animals out and it looks nice.
A section of 6' cedar privacy fence going up. The center opening is for a double gate.
Here is the double gate finished along with the rest of the section.
An open view of the double gate. The self-opening hinges are adjustable to easily fix any potential sag over time.
Here's another section of 6' cedar privacy fence in progress.
A nice clean finish on the corner of a 6' cedar privacy fence.
Here is some linoleum near an entryway that has lifted due to years of use and neglect.
Rotten subfloor due to weather working its way under a very loose front door threshold.
Tear out of rotten subfloor and loose threshold.
Removed flooring, baseboards, transitions, subfloor and threshold. Replaced subfloor.
Replaced flooring, threshold, baseboards and transitions.
Prepped linoleum to get flooring installed directly over. Cleaned, peeled up loose strips, removed transitions and baseboards.
Flooring installation in kitchen in progress.
Owner and operator Spencer laying it down, representing the brand, upholding a high standard of quality. Call that number for a free quote.
Clean and new looking LVP flooring installed in kitchen. Baseboards and transitions were installed the next day.